BEGIN:VCALENDAR
VERSION:2.0
PRODID:Linklings LLC
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
X-LIC-LOCATION:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:19700308T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:19701101T020000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20211208T164406Z
LOCATION:Level 2 - Exhibit Hall
DTSTART;TZID=America/Los_Angeles:20211206T170000
DTEND;TZID=America/Los_Angeles:20211206T180000
UID:dac_DAC 2021_sess249_DESPOST112@linklings.com
SUMMARY:SHIFT LEFT: NOVEL POWER ANALYSIS METHOD for LARGE-SCALE AI PROCESS
 ORS
DESCRIPTION:Designer, IP and Embedded Systems Track Poster Networking Rece
 ption\n\nSHIFT LEFT: NOVEL POWER ANALYSIS METHOD for LARGE-SCALE AI PROCES
 SORS\n\nMitra\n\nTraditional power analysis with simulation vectors lacks 
 real scenarios, requires a synthesized netlist and gate level vector, whic
 h is unavailable in the early stage. Shift left with the novel power analy
 sis method, we can quickly iterate of power features in the early stage of
  the project,  analyze the actual application scenarios vectors generated 
 by the emulator and provide billions training samples to obtain an accurat
 e real-time power model for SW and HW control. The advantage of this novel
  power analysis method is that it can speed up the turnaround time and mac
 hine resources at RTL stage, so it can carry out power analysis in the ear
 ly stage of the project and save the project development time.\n\nVirtual 
 Program: Presented In-Person
END:VEVENT
END:VCALENDAR
