BEGIN:VCALENDAR
VERSION:2.0
PRODID:Linklings LLC
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
X-LIC-LOCATION:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:19700308T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:19701101T020000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20211208T164408Z
LOCATION:Level 2 - Exhibit Hall
DTSTART;TZID=America/Los_Angeles:20211207T170000
DTEND;TZID=America/Los_Angeles:20211207T180000
UID:dac_DAC 2021_sess250_DESPOST125@linklings.com
SUMMARY:An Automated Approach to Pre-empt Clock-Divergence & Achieve Predi
 ctable Timing Closure
DESCRIPTION:Designer, IP and Embedded Systems Track Poster Networking Rece
 ption\n\nAn Automated Approach to Pre-empt Clock-Divergence & Achieve Pred
 ictable Timing Closure\n\nYogi, Chandran\n\nSynchronous clock distribution
  across large hierarchical designs result in huge clock divergence leading
  to setup-hold critical paths, which are caught late in timing convergence
  cycle.  Early detection of highly divergent clock paths and timely feedba
 ck to architecture and design team is crucial in reducing timing iteration
 s.\nThis paper describes a design-independent automation that can derive a
 ll high-risk clock divergent paths at SoC & all subsequent hierarchies dow
 nwards, looking at divergent clock path depth and distance. \nThe script i
 nvestigates timing paths in the design on a per-clock basis and provides a
  sorted priority list of critical divergent paths that needs attention. Th
 e reports hence generated captures all relevant information useful for clo
 ck architects, RTL and physical implementation team. The automation is des
 igned to run on both Primetime & ICC2/Fusion compiler at various design st
 ages such as placement, postCTS and postRoute providing information commen
 surate to the stage under investigation. The automation can serve as a hea
 lth check in the early stages to ensure the final timing closure cycle is 
 predictable and smooth.\n\nVirtual Program: Presented In-Person
END:VEVENT
END:VCALENDAR
